NEW BRIDGE AT ABCA
8/10/2018 10:55:43 AM


   
Morrison Dam is getting a new addition that will make vehicle traffic more accessable. Tommy Kokas is a Water Resources EIP with the Ausable Bayfield Conservation Authority and says that this new bridge will be located on the west side of Morrison line.

    Kokas says that Constructions is hopefully going to begin soon

    Kokas adds that the bridge will be finalized by November of this year.

Back to News




 
 
 
 

Copyright 2012 ExeterToday.ca. All rights reserved.

This site powered by PromoSuite Interactive